Bear Customer first, Excellent first in mind, we operate closely with our customers and supply them with efficient and expert services for Uf In Filter , Water Purifier , Ultrafiltration Nanofiltration , Change for that improved! is our slogan, which means A better globe is before us, so let's take pleasure in it! Change for the better! Are you all set?
China Manufacturer for Uf In Ro System - MBR Membrane Module Reinforced PVDF BM-SLMBR-25 Waste Water Treatment – Bangmo Detail:
Product Overview
MBR is a combination of membrane technology and bio-chemical reaction in water treatment. MBR filter the sewage in bio-chemical tank with membrane so that sludge and water are separated. On one hand, membrane rejects microorganisms in the tank, which greatly increase the concentration of activated sludge to a high level, thus the bio-chemical reaction of sewage degradation processes more rapidly and thoroughly. On the other hand, water output is clear and of high quality because of high precision of membrane.
This product adopts reinforced modified PVDF material, which will not peel or break when backwashing, meanwhile has good permeable rate, mechanical performance, chemical resistance and pollution resistance. ID & OD of reinforced hollow fiber membrane are 1.0mm and 2.2mm respectively, filtration precision is 0.1 micron. Filtration mode is outside-in, that is raw water, driven by differential pressure, permeates into the hollow fibers, while bacteria, colloids, suspended solids and microorganisms etc. are rejected in the membrane tank.
Applications
●Treatment, recycle and reuse of industrial waste water.
●Treatment of refuse leachate.
●Upgrade and reuse of municipal sewage.
Filtration Performance
No. |
Item |
Water Output Index |
1 |
TSS |
≤1mg/L |
2 |
Turbidity |
≤ 1 |
Specifications
Size
Technical Parameters
Structure |
Outside-in |
Membrane Material |
Reinforced Modified PVDF |
Precision |
0.1 micron |
Membrane Area |
25m2 |
Membrane ID/OD |
1.0mm/ 2.2mm |
Size |
785mm×2000mm×40mm |
Joint Size |
DN32 |
Component Material
Component |
Material |
Hollow Fiber Membrane |
Reinforced Modified PVDF |
Sealing Compound |
Epoxy Resins + Polyurethane (PU) |
Housing |
ABS |
Application Parameters
Designed Flux |
10~25L/m2.h |
Backwashing Flux |
30~60L/m2.h |
Operating Temperature |
5~45°C |
Maximum Operating Pressure |
-50KPa |
Suggested Operating Pressure |
0~-35KPa |
Maximum backwashingPressure |
100KPa |
Operating Mode |
9min Operation+1min Break/8min Operaetion+2min Break |
Blowing Mode |
Continuous Aeration |
Aeration Rate |
4m3/h.pc |
Washing Period |
Clean water backwashing every 2~4h; CEB every 2~4 weeks; CIP every 6~12 months |
Using Conditions
There should be appropriate pretreatments before UF. If defoamer has to be used, please choose alcohol defoamer, silicone defoamer is forbidden.
Item |
Value |
PH Range |
5~9 (washing: 2~12) |
Particle Size |
<2mm, no sharp particles |
Oil & Grease |
≤2mg/L |
Hardness |
≤150mg/L |
Product detail pictures:
Related Product Guide:
The abundant projects administration experiences and 1 to one provider model make the superior importance of small business communication and our easy understanding of your expectations for China Manufacturer for Uf In Ro System - MBR Membrane Module Reinforced PVDF BM-SLMBR-25 Waste Water Treatment – Bangmo , The product will supply to all over the world, such as: Pakistan, Bolivia, Korea, Nowadays our merchandise sell all over the domestic and abroad thanks for the regular and new customers support. We supply high quality product and competitive price, welcome the regular and new customers cooperate with us!