New Arrival China Water Filter Replacement - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our firm has been concentrating on brand strategy. Customers' satisfaction is our advertising. We also offer OEM provider for Membrane Bioreactor Process , Mbr Wastewater , Uf Water Treatment , At our firm with good quality initially as our motto, we manufacture merchandise that are entirely made in Japan, from materials procurement to processing. This enables them for being used with confident peace of mind.
New Arrival China Water Filter Replacement - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo Detail:

Applications

● Purification of surface water.
● Reuse of heavy metal waste water.
● Pretreatment of RO.

Filtration Performance

Below filtration effects are proved according to the use of modified PVDF hollow fiber ultrafiltration membrane in different types of water:

No. Item Water Output Index
1 TSS ≤1mg/L
2 Turbidity ≤ 1

Specifications

Size

product-description1

Chart 1 MBR Size

Technical Parameters

Filtering Direction Outside-in
Membrane Material Reinforced Modified PVDF
Precision 0.03  micron
Membrane Area 30m2
Membrane ID/OD 1.0mm/ 2.2mm
Size 1250mm×2000mm×30mm
Joint Size Φ24.5mm

Component Material

Component Material
Hollow Fiber Membrane Reinforced Modified PVDF
Sealing Compound Epoxy Resins + Polyurethane (PU)
Housing ABS

Using Conditions

Proper pretreatments must be set when raw water contains a lot of impurities/coarse particles or large proportion of grease. Defoamer must be used to remove foams in membrane tank when necessary, please use alcoholic defoamer which is not easy to scale.

Item Limit Remark
PH Range 5-9 (2- 12 when washing) Neutral PH is better for bacterial culture
Particle Diameter <2mm Prevent sharp particles to scratch membrane
Oil & Grease ≤2mg/L Prevent membrane fouling/sharp flux decrease
Hardness ≤150mg/L Prevent membrane scaling

Application Parameters

Designed Flux 15~40L/m2.h
Backwashing Flux Twice the designed flux
Operating Temperature 5~45°C
Maximum Operating Pressure -50KPa
Suggested Operating Pressure ≤-35KPa
Maximum backwashing Pressure 100KPa
Operating Mode Continuous opeartion, intermittent backwashing air flushing
Blowing Mode Continuous Aeration
Aeration Rate 4m3/h.piece
Washing Period Clean water backwashing every 1~2h; CEB every 1~2 days;Offline washing every 6~12 months

(Above information is for reference only, please adjust

according to actual differential pressure change rule)


Product detail pictures:

New Arrival China Water Filter Replacement - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo detail pictures


Related Product Guide:

It is our responsibility to meet your needs and efficiently serve you. Your satisfaction is our satisfactory reward. We are looking forward to your visit for joint growth for New Arrival China Water Filter Replacement - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo , The product will supply to all over the world, such as: Accra, Naples, Vietnam, we rely on own advantages to build a mutual-benefit commerce mechanism with our cooperative partners. As a result, we have gained a global sales network reaching the Middle East, Turkey, Malaysia and Vietnamese.
  • We are long-term partners, there is no disappointment every time, we hope to maintain this friendship later!
    5 Stars By Alva from Costa rica - 2018.04.25 16:46
    This manufacturer can keep improving and perfecting products and service, it is in line with the rules of market competition, a competitive company.
    5 Stars By EliecerJimenez from Iran - 2018.09.08 17:09
    Write your message here and send it to us