Our products are broadly regarded and reliable by end users and can meet up with constantly transforming financial and social requires of Uf Water Filter , Membrane Filtration Wastewater Treatment , Water Treatment Membrane , Customers' reward and fulfillment are usually our biggest objective. Please make contact with us. Give us a probability, provide you with a surprise.
Renewable Design for Mbr Wastewater Treatment Plant - UF Membrane Module 10 inch PVDF Ultrafiltration Membrane Module UFf250 Electroplating Waste Water Treatment – Bangmo Detail:
Applications
Drinking water treatment of tap water, surface water, well water and river water.
Pretreatment of RO.
Treatment, recycle and reuse of industrial waste water.
Filtration Performance
This product is proven to have below filtering effects according to the service conditions of different water sources:
Ingredient |
Effect |
SS, Particles > 1μm |
Removal Rate ≥ 99% |
SDI |
≤ 3 |
Bacteria, Viruses |
> 4 log |
Turbidity |
< 1NTU |
TOC |
Removal Rate: 0-25% |
*Above data is obtained under the condition that feeding water turbidity is < 25NTU.
Product Parameters
Technical Parameters
Filtering Type |
Outside-in |
Membrane Material |
Modified PVDF |
MWCO |
200K Dalton |
Membrane Area |
78m2 |
Membrane ID/OD |
0.8mm/1.3mm |
Dimensions |
Φ250mm*1710mm |
Connector Size |
DN50 Clamping |
Application Data
Pure Water Flux |
15,000L/H (0.15MPa, 25C) |
Designed Flux |
40-120L/m2.hr (0.15MPa, 25C) |
Suggested Working Pressure |
≤ 0.2MPa |
Maximum Transmembrane Pressure |
0.15MPa |
Maximum Backwashing Pressure |
0.15MPa |
Air Washing Volume |
0.1-0.15N m3/m2 .hr |
Air Washing Pressure |
≤ 0.1MPa |
Maximum Working Temperature |
45C |
PH Range |
Working: 4-10; Washing: 2-12 |
Operating Mode |
Cross Flow |
Feeding Water Requirements
Before feeding water, a security filter < 50 μm should be set to prevent blockage caused by large particles in raw water.
Turbidity |
≤ 25NTU |
Oil & Grease |
≤ 2mg/L |
SS |
≤ 20mg/L |
Total Iron |
≤ 1mg/L |
Continuous Residual Chlorine |
≤ 5ppm |
COD |
Suggested ≤ 500mg/L |
*Material of UF membrane is polymer organic plastic, there must not be any organic solvents in raw water.
Operating Parameters
Backwashing Flow Rate |
100-150L/m2.hr |
Backwashing Frequency |
Every 30-60min. |
Backwashing Duration |
30-60s |
CEB Frequency |
0-4 times per day |
CEB Duration |
5-10min. |
CIP Frequency |
Every 1-3 months |
Washing Chemicals: |
Sterilization |
15ppm Sodium Hypochlorite |
Organic Pollution Washing |
0.2% Sodium Hypochlorite + 0.1% Sodium Hydroxide |
Inorganic Pollution Washing |
1-2% Citric Acid/0.2% Hydrochloric Acid |
Component Material
Component |
Material |
Membrane |
Modified PVDF |
Sealing |
Epoxy Resins |
Housing |
UPVC |
Product detail pictures:
Related Product Guide:
We follow our enterprise spirit of Quality, Efficiency, Innovation and Integrity. We aim to create much more worth for our buyers with our abundant resources, highly developed machinery, experienced workers and great providers for Renewable Design for Mbr Wastewater Treatment Plant - UF Membrane Module 10 inch PVDF Ultrafiltration Membrane Module UFf250 Electroplating Waste Water Treatment – Bangmo , The product will supply to all over the world, such as: Ecuador, Greenland, panama, Our qualified engineering team will usually be prepared to serve you for consultation and feedback. We are able to also deliver you with absolutely free samples to meet your needs. efforts might be made to offer you the ideal service and products. For anyone who is interested in our company and items, please make contact with us by sending us emails or contact us right away. In order to know our solutions and organization. ar more, you can come to our factory to determine it. We are going to usually welcome guests from around the globe to our corporation. o create small business relations with us. Please really feel no cost to speak to us for enterprise.