Wholesale Dealers of Mbr Wastewater - UF Membrane Module 10 inch PVC Ultrafiltration Membrane Module UFc250B River Water Treatment – Bangmo

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our aim would be to fulfill our shoppers by offering golden company, very good value and good quality for Ultra Filtered Water , MBR Module , Ultrafiltration Process , We warmly welcome your participation based on mutual benefits in the near future.
Wholesale Dealers of Mbr Wastewater - UF Membrane Module 10 inch PVC Ultrafiltration Membrane Module UFc250B River Water Treatment – Bangmo Detail:

Applications

Production of mineral water, mountain spring water and other sterile liquid.
Drinking treatment of tap water, surface water, well water, river water, etc.
Pretreatment of RO.
Treatment, recycle and reuse of industrial waste water.

Filtration Performance

This product is proven to have below filtering effects according to the service conditions of different water sources:

Ingredient Effect
SS, Particles > 1μm Removal Rate ≥ 99%
SDI ≤ 3
Bacteria, Viruses > 4 log
Turbidity < 0.1NTU
TOC Removal Rate: 0-25%

*Above data is obtained under the condition that feeding water turbidity is < 15NTU.

Product Parameters

product-description1

Technical Parameters

Filtering Type Inside-out
Membrane Material Modified PVC
MWCO 100K Dalton
Membrane Area 48m2
Membrane ID/OD 1.0mm/1.8mm
Dimensions Φ250mm*1710mm
Connector Size DN50 Clamping

Application Data

Pure Water Flux 12,000L/H (0.15MPa, 25C)
Designed Flux 35-100L/m2.hr (0.15MPa, 25C)
Suggested Working Pressure ≤ 0.2MPa
Maximum Transmembrane Pressure 0.2MPa
Maximum Working Temperature 45°C
PH Range Working: 4-10; Washing: 2-12
Operating Mode Cross-flow or Dead-end

Feeding Water Requirements

Before feeding water, a security filter < 50 μm should be set to prevent blockage caused by large particles in raw water.

Turbidity ≤ 15NTU
Oil & Grease ≤ 2mg/L
SS ≤ 20mg/L
Total Iron ≤ 1mg/L
Continuous Residual Chlorine ≤ 5ppm
COD Suggested ≤ 500mg/L

*Material of UF membrane is polymer organic plastic, there must not be any organic solvents in raw water.

Operating Parameters

Maximum Backwashing Pressure 0.2MPa
Backwashing Flow Rate 100-150L/m2.hr
Backwashing Frequency Every 30-60min.
Backwashing Duration 30-60s
CEB Frequency 0-4 times per day
CEB Duration 5-10min.
CIP Frequency Every 1-3 months
Washing Chemicals:
Sterilization 15ppm Sodium Hypochlorite
Organic Pollution Washing 0.2% Sodium Hypochlorite + 0.1% Sodium Hydroxide
Inorganic Pollution Washing 1-2% Citric Acid/0.2% Hydrochloric Acid

Component Material

Component Material
Membrane Modified PVC
Sealing Epoxy Resins
Housing UPVC

Product detail pictures:

Wholesale Dealers of Mbr Wastewater - UF Membrane Module 10 inch PVC Ultrafiltration Membrane Module UFc250B River Water Treatment – Bangmo detail pictures

Wholesale Dealers of Mbr Wastewater - UF Membrane Module 10 inch PVC Ultrafiltration Membrane Module UFc250B River Water Treatment – Bangmo detail pictures


Related Product Guide:

Our business promises all users of the high quality items and satisfying post-sale company. We warmly welcome our regular and new prospects to join us for Wholesale Dealers of Mbr Wastewater - UF Membrane Module 10 inch PVC Ultrafiltration Membrane Module UFc250B River Water Treatment – Bangmo , The product will supply to all over the world, such as: Switzerland, Belgium, South Africa, Our company warmly invites domestic and overseas customers to come and negotiate business with us. Let us join hands to create a brilliant tomorrow! We are looking forward to cooperating with you sincerely to achieve a win-win situation. We promise to try our to provide you with high quality and efficient services.
  • Sales manager is very enthusiastic and professional, gave us a great concessions and product quality is very good,thank you very much!
    5 Stars By James Brown from Honduras - 2018.12.22 12:52
    We are old friends, the company's product quality has been always very good and this time the price is also very cheap.
    5 Stars By Tony from Stuttgart - 2017.11.29 11:09
    Write your message here and send it to us